Mineral Processing Facility
HDPE DN500 Flotation Cell Discharge Line –
Stub-End Joint Perforation
Mineral Processing Facility
HDPE DN500 Flotation Cell Discharge Line –
Stub-End Joint Perforation
A 1” external perforation formed on an HDPE slurry line due to abrasive wear at the stub-end joint. The repair site was complicated by misaligned flanges and difficult bolt access, challenging both sealing and re-torquing efforts.
Products Used
UPS ASME EMERGENCY PIPE REPAIR BANDAGE UPS 19060 SG THISTLEBOND STICK GRADE METALFull leak sealing achieved within the hour | Pipe remained in operation during and after the repair | Durable reinforcement against high-pressure slurry | Rapid, cost-efficient field solution requiring minimal equipment | Extended life of the HDPE line while replacement was scheduled
This fast, high-integrity repair showcases the effectiveness of UPS products for tackling complex HDPE pipe failures in abrasive, high-demand environments — keeping operations flowing without compromise.