After a rupture occurred on a critical 22” aqueduct transporting water to the plant, the client performed an initial welded patch. To ensure lasting protection and reinforcement, UPS composite wrap technology was deployed over the repair site.
Robust reinforcement applied while line remained in operation | Superior mechanical strength over existing welded area | Minimal disruption to the water supply system | Simple yet high-performing repair using no heavy tools or welding | Avoided major replacement works and operational shutdown
This case highlights how UPS composite wraps provide not just emergency sealing, but long-term structural reinforcement — protecting essential infrastructure with proven reliability in the field.